|
hoghunter71409
|
 |
« on: January 26, 2021, 07:15:40 pm » |
|
Judge - I did exactly as you said and it worked perfect!!!!
I also thought about the chain on concrete. I'm thinking about setting the T-post all the way into the ground with a hole drilled in it for the chain the same way I just did it. Then, take a 3" schedule 40 PVC and drive it into the ground and use it as a sleeve and keep it flush with the top of the concrete. Pull the chain attached to the T-post through the sleeve.
Pour the concrete and the chain will only stay in contact with the PVC sleeve.
Sent from my SM-G950U using Tapatalk
|
|
|
|
|
Logged
|
|
|
|
|