Concrete work has started. Between each section of concrete will be a ~18" section of flagstone.

The area to the right in this picture will be an outdoor kitchen, with a limestone fireplace/ grill

Center of this section will have a 6' diameter flagstone star


Notice the slope in each section, so that the stall/kennel area can be washed out.

Far left corner in this photo will be a full bar, and restroom/shower area.

